A question we are often asked is “What is difference between verification and validation?” This two-part blog answers that question. In part 1 we discuss the basic concepts of verification and validation in terms of the context in which they … Read More
Blog
Archive for 2015
Features an SE Tool Set Should Have – Update3
Note: I originally came up with the list of features with a focus on features that a Requirement Management Tool (RMT) should have to better manage an organization’s requirements throughout the product development lifecycle. During the discussion of these features … Read More
Technology Readiness Levels applied to Medical Device Development
In our previous blog “Using Technology Readiness Levels to Manage Risk” we introduced the concept of Technology Readiness Levels (TRLs). In that article, the basic descriptions for TRLs as used by NASA and the Department of Defense (DOD) were presented. … Read More
Join us for our upcoming LIVE Webinar
Conducting Requirement Inspections: Achieve Cost Savings through Early Requirement Defect Detection Studies show that between 25-50% of software project budgets are eaten up by rework and 70-85% of this rework is related to flawed requirements. Want to reduce your project … Read More
Using Technology Readiness Levels to Manage Risk
In a previous blog “Are the Requirements Attainable?”, we mentioned that one reason requirements may be not be attainable was because the ability to meet a given requirement was based on an immature technology. Engineers, scientists, and marketing personnel often … Read More