Tag Archives: risk management

Blog

Posts Tagged ‘risk management’


Technology Readiness Levels applied to Medical Device Development

Posted on: November 30th, 2015 by Lou Wheatcraft No Comments

In our previous blog “Using Technology Readiness Levels to Manage Risk” we introduced the concept of Technology Readiness Levels (TRLs).  In that article, the basic descriptions for TRLs as used by NASA and the Department of Defense (DOD) were presented.  … Read More

Using Technology Readiness Levels to Manage Risk

Posted on: October 30th, 2015 by Lou Wheatcraft No Comments

In a previous blog “Are the Requirements Attainable?”, we mentioned that one reason requirements may be not be attainable was because the ability to meet a given requirement was based on an immature technology. Engineers, scientists, and marketing personnel often … Read More

Developing Agile Systems

Posted on: October 15th, 2015 by Lou Wheatcraft No Comments

In previous blogs we talk about Why do my requirements keep changing and Controlling and Managing Change during product or system development.   Change can also be addressed from the perspective of change that happens after the product or system is … Read More